home

updated 09/07/2014

New Plans              Old Plans       DWG                                          Layout Sketches                                                               Oww-ies

Before and After Photos (outside)

New Slideshows

 

2014_patio_finished

 

     

 

 

 

 

 

 

                             

 

 

rAddition First Floor (Kitchen/Dining Rm) Entry Room & Guest Bedroom

2013_window_trim_installation

Occupancy granted Jan 18th 2011

Final Occupancy, hardwood 1st floor

Kitchen Dining Room opened up
Temporary Occupancy

Appeal granted by Mass BRBA

Stair Problem (word doc)

Woodstove_Bathroom_Tile_Painting
Fireplace Veneering
In Process Painting
Final Rough Photos (rm x rm)
Plastering
Blueboard Delivery  
Insulation Wrapup  
Attic Foamboard Insulation and Misc
Attic Interior Framing
HVAC
Sprayfoam Insulation
Framing Inspection Issues
Outside Trim is Done
HVAC
Driveways

90 percent done

2013_Woodstove_Fireplace_Mantel

Siding Almost Done & Misc

Almost Done
Old Concrete Step Demolitio Custom Hood Finale Movie

Siding Start & Fireplace Header

Kitchen Cabinet Installation quicktime mov download
Exterior Framing Done Kitchen Ductwork Final Slideshow
Roof Done Drywall Sander Bedroom Door Screwup
Weekend Misc & 1st floor window start Drywall Bucket Stilts Bamboo Flooring
Roof Shingling & Chimney Extension Start Drywall Banjo Tile and Paint
Attic Wall Framing Drywall Hanging Guest Bed Room Drywall
Roof Rafters Tile Grouted and Plywood backing done Entry Room Drywall
Rain Issues Plywood backing for Cabinets Drywall Prep
2nd Floor Tiling Exterior Finished
Wall Construction Rough Electrical New Plumbing photos
Roof_Removal_Back Insulation New Front Exterior
Joist Sistering Plumbing Shingled Windows
Roof_Removal_Front Wood Floor Reuses Entry Room New Windows
gutted rooms Support Beam Installations Entry Room Demo
tyvek Bathroom Demo & Wall Shimming
house_stripped Large window installation
kitchen_demo Bedroom/Living room before gutting
Patio Basement Outdoor

2012_09_patio_before_winter

2012_08_19_Patio_Ramps_Drainage_Posts

2012_08_03_Patio_Progress

2013_08_30_fence_completed

2012_07_01_Patio_Rock_Splitting

2008_05_11_organization

2013_07_03_fence_pics

Front Entry and Mulch of 2nd tier 2008_04_20_lally_column_installation 2013_07_03_panel_assembly
Final Patio Slideshow 2008_04_13_new_footers 2013_07_03_panel_moving
Paver Cutting Technique 2006_shingled_basement_window_finally 2013_07_03_posthole_digging
In Progress photos 2005_09_21_new oil furnance

2013_07_03_misc

Ooops_bad_walkway 2004 sep 12 basement window installed 2013_04_27_fence_gate
2006_08_08_patio_new_steps 2004_06_30 foundation_cut 2008_04_17_soil_sifter
2006_07_01_patio_update 2002 10 26 utility sink 2006_07_01_lawnmower_shed
2005_11_2_retaining wall update 2003_09_electric_burial
2005_10_20_retaining wall update 2005_09_07_new fence gate
2005_10_17_retaining wall update 2004 June 20 tractor rental
2005_09_06_retaining wall delivery 2004 June 5 stumpgrinding
2005_09_21_retaining wall basement walkout 2004 01 13 electric pole